This article is rated C-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
This page has archives. Sections older than 180 days may be automatically archived by Lowercase sigmabot III when more than 4 sections are present. |
Hello fellow Wikipedians,
I have just modified 4 external links on Brisbane Airport. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template ((source check))
(last update: 5 June 2024).
Cheers.—InternetArchiveBot (Report bug) 23:01, 25 July 2017 (UTC)
Hello fellow Wikipedians,
I have just modified 4 external links on Brisbane Airport. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template ((source check))
(last update: 5 June 2024).
Cheers.—InternetArchiveBot (Report bug) 01:59, 4 September 2017 (UTC)
After 29 March 2019, the Brisbane-Beijing flights are not bookable. They are also not showing in any booking engine or any online schedule system such as OAG,Google Flights or Amadeus. Therefore, it is accurate to state this route is ending 29 March. You cannot cite a source for something that does not exist.
The Air China route is now marked as Seasonal so we don't add end date for them as they will return later on in the year. So best to leave it as it was. CHCBOY (talk) 18:49, 3 September 2018 (UTC) The Air China route is NOT seasonal... Air China has NOT indicated anywhere the route will be return- it is resuming ONLY for JAN - MAR 2019. Unless Air China state the route is returning you can't mark it as seasonal. — Preceding unsigned comment added by 58.7.195.57 (talk) 05:48, 1 January 2019 (UTC)
Also we have to go by the source itself, which is very recent last October. Which says Beijing to Brisbane is resuming on 18 January 2019. No mention of it ending at all. CHCBOY (talk) 10:22, 1 January 2019 (UTC)
Quote from Air China's press release. "2. Beijing-Brisbane-Beijing route flight CA795/CA796:
Phased cancellation from August 24, 2018 to January 17, 2019, and resumed on January 18, 2019 to March 30, 2019, Phased cancellation from March 31, 2013 to October 26, 2019."
124.170.143.109 (talk) 10:15, 8 January 2019 (UTC)
The press release from air china.com.au that everyone keeps referring to has been removed. The schedules for all other Air China routes have now been loaded for October 2019 onwards and no flights have been loaded for BNE-PEK. If you follow this link, that press release has been removed. https://www.airchina.com.au/AU/GB/info/news/?NEWS_CATEGORY=TaiWanSite — Preceding unsigned comment added by 123.243.53.61 (talk) 09:52, 9 April 2019 (UTC)
The second round of Qatar Airways flights are still repatriation charters- even the press release referenced hints at it- you just need to learn how to interpret the spin: 14 May 2020 Press releases Airline was previously given exceptional approval to operate to Brisbane in early April, helping to take over 5,000 people home Qatar Airways recently announced plans for the gradual resumption of services, with plans to expand its network to 80 destinations by the end of June
The magic words are "by the end of June".
And this link clearly states the flights end 30 June: https://www.routesonline.com/news/38/airlineroute/291277/qatar-airways-resumes-brisbane-service-in-mayjune-2020/ 2001:B07:A96:1D74:ED5B:7F50:FF1:6CB7 (talk) 16:41, 23 May 2020 (UTC)BNEQR
As flight announcements are happening nearly every week regarding routes starting ending etc. We could wait till end of June if Qatar continue with their Brisbane flights or not. I'm sure we will see another schedule update from airlineroute soon. CHCBOY (talk) 22:48, 24 May 2020 (UTC)