This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: "Pakistan Locomotive Factory" – news · newspapers · books · scholar · JSTOR (November 2016) (Learn how and when to remove this message)
Pakistan Locomotive Factory Risalpur
پاکستان لوکوموٹو کارخانه رسالپور
Company typeState-owned enterprise
IndustryLocomotive manufacturing
Founded1993
Headquartersnowshere risalpur, ,
Productstrain engine and train related
Ownergovernament

Pakistan Locomotive Factory (Urdu: پاکستان لوکوموٹیو کارخانہ رسالپور, or PLF) is a manufacturer of locomotives for Pakistan Railways, located in Risalpur, Khyber Pakhtunkhwa, Pakistan. The company was established in 1993. A total of 2,130 coaches have been manufactured at Carriage Factory Islamabad since 1971. The factory had overhauled 1,039 coaches up to 30 June 2015.

History

[edit]

The factory was established in Risalpur in 1993 at a total cost of Rs. 2284 million (US$7.9 million). Its function is to manufacture indigenous diesel electric locomotives and electric locomotives, thus allowing Pakistan Railways to have less dependency on foreign technology.

In January 2016, the Minister for Railways, Khawaja Saad Rafique announced that Pakistan Locomotive Factory is to enter a joint venture with private sector participation.[1]

Function

[edit]

The designed production capacity of the factory is 25 diesel electric locomotives per year. The production capacity can however be increased by introducing double shifts. Technology for manufacturing of locomotives have been acquired over the years from Hitachi, General Electric, Adtranz and Dalian Locomotive and Rolling Stock Works. Since 1993, the factory has manufactured a total of 102 new 2000-3000 hp diesel-electric locomotives for Pakistan Railways. It has also refurbished 26 outdated locomotives of 2000-2400 hp. Various spare parts for locomotives are also manufactured.

According to a report for 2014-2015, a total of 1,052 work orders have been completed for Pakistan Railways, amounting to Rs. 503.256 million (US$1.7 million). Work orders completed for private sector are 34 in number, amounting to Rs. 55.875 million (US$190,000) and work orders completed for major repairs of DE locomotives are 138 number amounting to Rs. 268.660 million (US$930,000).

Projects

[edit]

Current

[edit]

Completed

[edit]
Abbreviations
Note

There are some disagreements between sources irfca.org [7] and pakistanrail.com [8]. For example, on horsepower of Class DPU 30. There are also minor differences in building dates.