Usage

[edit]

Move review discussions typically are closed after 7 days of discussion. Due to the nature of these discussions, the standards followed in move review discussions differ from those of other discussions. Closers must be very familiar with the standards and outcomes used in the move review process.

To archive a move review discussion:

====[[Header]]==== ← Replace with ((subst:move review top|[[Header]]|RESULT))
    Header (edit | talk | history | protect | delete | links | watch | logs | views) ← If this is missing from the discussion it should be included for archiving.
DISCUSSION ← Body of the discussion stays unchanged
((subst:move review bottom)) ← Add bottom template


See also

[edit]