This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: "Niayesh Tunnel" – news · newspapers · books · scholar · JSTOR (May 2021) (Learn how and when to remove this template message)
Tunnel

The Niayesh Tunnel Project is a road traffic tunnel in the north of Tehran, Iran.

The Niayesh tunnel has two parallel roads that are within 130 m (430 ft) of each other for most of the route. Traffic in the north tunnel flows from east to west. In the south tunnel it flows from west to east.

For the first time in Iran, there are some embranchments of other tunnels among main tunnels. Among the north tunnel, Kordestan tunnel with a length of 950 m (3,120 ft) – the same length as the Resalat tunnel – is branched from the north tunnel that it makes accessible to downtown and Hemmat highway through a connection between the north tunnel and Kordestan Highway. Also, the north Kordestan highway would be connected to the south tunnel through a 194-metre (636 ft) tunnel that provides traffic flow to east Tehran. The total length of the main tunnels as the second longest urban tunnel in the world excluding ramps is 6,658 metres (21,844 ft). The total length of the main tunnels and access tunnels, including ramps, is 10,252 metres (33,635 ft).

Project implementation

Main tunnel execution started 26 March 2011 after finishing the site mobilization. On 19 March 2012 all the excavation finished. The average rate of excavation in tunnel was 18.5 metres (61 ft) per day with NATM method of excavating. In this project 200,000 m3 (7,100,000 cu ft) soil excavated in the ramps areas.

All excavation volume 1,100,000 m3
Cutting volume 200,000 m3
Concrete volume 270,000 m3
All bar weights 60,000 ton

The concrete volume poured was 270,000 cubic metres (9,500,000 cu ft), of which 95 percent was done during 7 months using 17 formworks. The average rate of pouring concrete was 30 metres (98 ft) per day for the tunnel's full face. This project has 8,000-square-metre (86,000 sq ft) peripheral buildings which are built within three months. The 4,000-square-metre (43,000 sq ft) main control building was built by modern methods and prepared for ITS systems installation within two months. In executing parts of the project, considering the job difficulties, there were three working shifts each day that the number of labor achieved to 4800 persons and it can be considered 6000 persons including indirect workers.

The project’s branches in excavating and pouring concrete

The project's Attributes during exploitation

ITS

Equipment Numbers
Tunnel Lighting System 2867
Tunnel Ventilation System (Jet Fans) 62
AID Camera 116
PTZ Camera 57
Fixed Camera 18
EEIS (Emergency Exit Information Sign) 36
EPA (Emergency Phone Advice) 49
EWNL (Escape Way Navigation Light) 123
LCS (Lane Control Sign) 92
TIBD (Tunnel Information Board Display) 8
TL (Traffic Light) 24
LSP (Loud Speaker) 123
VMS (Variable Message Sign) 16
AVS (Air Velocity Sensor) 14
COVS (CO and Visibility Sensor) 12
Overhead Vehicle Detector 3
FDS (Flood Detection Sensor Set) 5
Fire Box 150
E.C.N., E.C.N.s and Hydrant Niches Fire Rated Doors 98
Adits and Cross Passages Fire Rated Doors 19