.mw-parser-output .hidden-begin{box-sizing:border-box;width:100%;padding:5px;border:none;font-size:95%}.mw-parser-output .hidden-title{font-weight:bold;line-height:1.6;text-align:left}.mw-parser-output .hidden-content{text-align:left}@media all and (max-width:500px){.mw-parser-output .hidden-begin{width:auto!important;clear:none!important;float:none!important))You can help expand this article with text translated from the corresponding article in Hungarian. (April 2018) Click [show] for important translation instructions. View a machine-translated version of the Hungarian article. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia. Consider adding a topic to this template: there are already 595 articles in the main category, and specifying|topic= will aid in categorization. Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article. You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Hungarian Wikipedia article at [[:hu:M85-ös autóút (Magyarország)]]; see its history for attribution. You should also add the template ((Translated|hu|M85-ös autóút (Magyarország))) to the talk page. For more guidance, see Wikipedia:Translation.
M85 expressway shield
M85 expressway
M85-ös autóút
Map key - blue in use Map key - green planned Map key - grey other highways
M85 Enese1.JPG
M85 near Enese
Route information
Part of E65
Length83 km (52 mi)
95 km (59 mi) planned
Existed2008–present
Major junctions
From M1 near Győr
Major intersections
  • 85 near Győr, Csorna, Fertőd and Sopron
  • M86 near Csorna
  • 84 near Nagycenk and Sopron
ToSopron
A 3 border with  Austria
Location
CountryHungary
CountiesGyőr-Moson-Sopron
Major citiesGyőr, Csorna, Sopron
Highway system
  • Roads in Hungary
Junction near Győr
Near Csorna

The M85 expressway (Hungarian: M85-ös autóút) is a Hungarian expressway connecting Győr to Sopron. It will eventually connect M1 motorway to the Austrian border.

Timeline

Section Length Opened Notes
Győr nyugat (M1) – Enese 8.0 km (4.97 mi) 16 June 2015[1] Built between 2013 – 2015.
Enese bypass 7.0 km (4.35 mi) 21 December 2011 Built between 2009 – 2011.
Enese – Kóny 3.0 km (1.86 mi) 16 June 2015[1] Built between 2013 – 2015.
Kóny – Csorna 6.0 km (3.73 mi) 9 September 2015[2] Built between 2013 – 2015.
Csorna bypass I. 5.0 km (3.11 mi) 9 September 2015[2] Segment I. (East), built between 2013 – 2015.
Common route with M86 expressway. This section was extended 2x3 lane.
Csorna bypass II. (M86 junction - Csorny nyugat) 4.5 km (2.80 mi) 15 December 2017[3] Segment II. (West), built between 2015 – 2017.
Csorna nyugat – Sopron kelet 51.0 km (31.69 mi) 16 December 2020 Built between 2017 – 2020.
Sopron kelet – Balf 2.5 km (1.55 mi) 9 June 2021 Built between 2017 – 2021.
Balf – Sopron észak 6.4 km (3.98 mi) 10 December 2021 Built between 2018 – 2021.
Sopron észak to the border 4.6 km (2.86 mi) Planned in 2024 Under construction, with Sopron Tunnel

Route description

This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can. (November 2021)
County km Type Destination Notes

Győr-Moson-Sopron
0 Roundabout Main road 1 – Győr /
M1 / E60 / E75Mosonmagyaróvár, towards to Vienna (A), Bratislava (SK) /

Main road 85 – Ikrény /


M1 / E60 / E75Budapest and 14 / E575 Vámosszabadi

The eastern terminus of the Expressway expressway.

Kilometrage starting point


Roundabout and interchange junction

8 Exit Rábapatona
10 Exit Lébény, Bezi / Enese, Tét
16 Exit Kóny / Rábcakapi Connecting to petrol station and Truck parking.
21 Exit Main road 85 – Csorna
23 Interchange 85 / E65Mosonmagyaróvár

M85Sopron /
M86 / E65 Szombathely, towards to Marbor (SLO)

The northern terminus of the common road with M85-M86 expressways, and E65 route.

The eastern part of Csorna bypass.


The northern terminus of 2x3 lane road.

Bridge over the Győr–Sopron railway line
25 Bridge over the Pápa–Csorna railway line
27 Interchange M85Sopron, Kapuvár

M86 / E65 Szombathely, towards to Marbor (SLO)

The southern terminus of the common road with M85-M86 expressways, and E65 route.

The southern part of Csorna bypass.


The southern terminus of 2x3 lane road.

Bridge over the Hegyeshalom–Szombathely railway line
32 Exit Jobaháza, Farád / Csorna nyugat nyugat means West
40 Rest area Babóti pihenőhely parking, WC, and water (petrol station in the future)

pihenőhely means Rest area

44 Exit Beled, Hövej / Kapuvár
53 Exit Fertőd, Fertőendréd Connecting to Main road 85.
55 Rest area Széchenyi pihenőhely parking, WC, and water
60 Exit Kőszeg, Lövő / Fertőszentmiklós
68 Bridge under the Győr–Sopron railway line
72 Exit Main road 84 – Nagycenk / Sárvár Connection to Sopron, and the Lake Balaton.
78 Rest area Hutbájd pihenőhely parking, WC, and water

Tengelysúlymérő állomás means weigh in motion (trafic controll)

79 Bridge over the Győr–Sopron railway line
Bridge Ikva híd híd means Bridge
82 Exit Main road 84 – Kópháza (border) / Sopron Centrum

Harka

85 Exit Sopron-Balf / Sopron-Pihenőkereszt
89 Exit Sopron észak / Fertőrákos észak means North
90 Tunnel Soproni alagút Length: 780 m

alagút means Tunnel

93 Exit Main road 84 – Sopron nyugat / Ágfalva nyugat means West

Western under construction section

94 Rest area Scarbantia pihenőhely Planned
95 Border crossing within the EU Soporn (H) – Klingenbach (AT) border crossing
A 3Eisenstadt towards to Vienna
Planned
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Maintenance

The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc.. This activity is provided by these highway engineers.

Payment

Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica);

2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:

Type of county vignette Available section
Győr-Moson-Soporn full length (0 km – 83 km)

See also

References

  1. ^ a b M85: átadták a Győr-Kóny szakaszt - fotók, videó
  2. ^ a b Már a miénk az M85-ös Csorna és Kóny között! - fotók
  3. ^ M85: pénteken átadják a csornai elkerülőt - Áder János is ott lesz
  4. ^ "National Toll Payment Services PLC - E-vignette rates from 1 January 2024". toll-charge.hu.