Hp | |||||||||||
General information | |||||||||||
Location | Güterring 2, Leipzig, Saxony Germany | ||||||||||
Coordinates | 51°19′57″N 12°25′13″E / 51.3326°N 12.4204°E | ||||||||||
Line(s) |
| ||||||||||
Platforms | 1 | ||||||||||
Tracks | 1 | ||||||||||
Other information | |||||||||||
Station code | 146[1] | ||||||||||
DS100 code | LACF[2] | ||||||||||
IBNR | 8010008 | ||||||||||
Category | 6[1] | ||||||||||
Fare zone | MDV: 110[3] | ||||||||||
Website | www.bahnhof.de | ||||||||||
Services | |||||||||||
| |||||||||||
|
Leipzig Anger-Crottendorf is a railway station in the city of Leipzig, Germany. The station was located on the Leipzig Hbf–Leipzig-Connewitz railway until its closure in November 2012. As part of City Tunnel network enhancements it was rebuilt thereafter a few meters east at the Leipzig-Engelsdorf–Leipzig-Stötteritz section of the Leipzig Freight Ring and reopened along with Leipzig City Tunnel on 15 December 2013. The station is served by the S-Bahn Mitteldeutschland since then, train services are operated by Deutsche Bahn.
Since 2019 the station has been under reconstruction. Both platforms have been deconstructed and will be replaced by a new central platform. The bridges crossing Zweinaundorfer Straße are being rebuilt in shifted positions and the tracks will get a slightly different layout, in order to increase the speed limit from 60 to 80 km/h. During 2021 only one platform and one track is being operated. The project is planned to be completed in 2024.[4]
S-Bahn Mitteldeutschland services currently call at the station.[5]