The topic of this article may not meet Wikipedia's general notability guideline. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.Find sources: "Kadugundanahalli metro station" – news · newspapers · books · scholar · JSTOR (April 2024) (Learn how and when to remove this message)

Kadugundanahalli
Namma Metro station
General information
Other namesArabic College
LocationArabic College, Rashad Nagar, Govindapura, Nagavara, Bengaluru, Karnataka 560045
Coordinates13°01′47″N 77°37′14″E / 13.02984°N 77.62066°E / 13.02984; 77.62066
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsIsland platform (TBC)
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeUnderground, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningMarch 2025; 7 months' time (March 2025) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Nagawara
Terminus
Pink Line
(Future Service)
Venkateshpura
Location
Map

Kadugundanahalli is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Arabic College followed by other prime neighbouring suburban areas like Venkateshpuram, Nagavara, Hennur and Rashad Nagar. This metro station is stated to become operational around March 2025.[2][3][4][5][6]

History

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Kadugundanahalli metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.

Station Layout

Station Layout - To Be Confirmed

Kadugundanahalli track layout (TBC)
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Kalena Agrahara next station is Venkateshpura
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara Change at the next station for Blue Line
L2

Connections

This section is empty. You can help by adding to it. (April 2024)

Entry/Exit

This section is empty. You can help by adding to it. (April 2024)

See also

References

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. ^ "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. ^ Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.