Hough End | |
---|---|
Metrolink station | |
General information | |
Location | Chorlton-cum-Hardy, City of Manchester England |
Line(s) | Manchester Airport Line |
Other information | |
Status | Proposed station |
History | |
Opened | N/A |
Opening | N/A |
Hough End tram stop was a proposed tram stop on the phase 3b plans to Manchester Airport. It was originally due to open in 2016 but was dropped from the plans.