![]() HST-2 leaving Yarmouth Harbour
| |
History | |
---|---|
![]() | |
Name | Alakai |
Owner |
|
Operator |
|
Port of registry |
|
Builder | Austal USA |
Cost | US$88M |
Yard number | 615 |
Way number | 1 |
Laid down | June 3, 2004 |
Launched | January 18, 2007 |
Christened | April 14, 2007 |
Maiden voyage | August, 2007 |
In service | 2007 |
Identification |
|
Status | In service |
General characteristics | |
Type | Ferry |
Tonnage | 8,127 GT |
Displacement | 1,646 tons |
Length | 349 ft (106 m) |
Beam | 78 ft (24 m) |
Draft | 12 ft (3.7 m) |
Decks | 4 |
Deck clearance | 14 ft (4.3 m) |
Installed power | 4 x MTU-8000 diesel engines |
Propulsion | 4 x Rolls-Royce KaMeWa 125MkII waterjets |
Speed | 35 knots (65 km/h; 40 mph) |
Capacity | 866 passengers, 282 cars |
Crew | 21 |
HST-2, formerly named USNS Puerto Rico and Alakai, is a vessel owned by the United States Navy Military Sealift Command. She was originally Hawaii Superferry's first high-speed ferry. The vessel was later chartered by Bay Ferries Limited to operate a ferry service between Maine and Yarmouth, Nova Scotia.
The design of the Spearhead-class expeditionary fast transport is similar to the two high-speed ferries operated by Hawaii Superferry, both built by Austal USA.
HST-2 was built as Alakai, which means "sea path" in the Hawaiian language. The vessel is a 349-foot (106 m) long high-speed roll-on/roll-off (Ro/Ro) passenger and vehicle ferry. She used to operate a daily service operated by Hawaii Superferry at a speed of 35 knots (65 km/h; 40 mph) between the islands of Oahu and Maui. HST-2 has a capacity of 866 passengers and up to 282 subcompact cars. Alternately, its vehicle decks can be reconfigured in five minutes to carry up to 20 large trucks and 90 cars.[1]
Like her sister ship USNS Guam (formerly Huakai), the vessel features environmentally friendly technologies including non-toxic bottom paint, zero wastewater discharge and clean diesel engines.[2]
Hawaii Superferry's vessels were designed and built by Austal USA, a subsidiary of Austal, an Australian company that is the world's largest builder of fast ferries. Construction on HST-2 began in June 2004 in Mobile, Alabama. The ship was launched in January 2007, christened in April 2007 and sea trials went smoothly.
The vessel arrived as Alakai in Honolulu, Hawaii on June 30, 2007, with a celebration,[3] after a smooth 17-day delivery voyage.[4] The ship's maiden voyage was on August 26, 2007, and the trip to Maui was smooth. The voyage to Kauai was rougher and Alakai was met by about a dozen protestors on surfboards blockading the entrance to Nawiliwili Harbor. The protestors were peacefully cleared by the United States Coast Guard.
On February 13, 2008, Alakai went into dry dock to make repairs to her auxiliary rudders that were damaged in late January. The dry docking was extended due to hull damage caused when a tugboat moving Alakai into dry dock lost power and collided heavily with the catamaran.[5] Alakai returned to service in early April 2008 shortly after Aloha Airlines ended service.[6] Before resuming service the ship went through sea trials and was re-certified by the Coast Guard.
On March 17, 2009, after about 11 months in service, the Hawaii Supreme Court ruled that the legislation permitting Alakai to operate without an environmental review was unconstitutional. Hawaii Superferry made one last round trip to allow an orderly return of passengers who were not on their home island. They canceled existing reservations and did not take new reservations. The Superferry company intended to look for other work for Alakai; it had also left open the possibility of bringing the ferry back into service if and when Hawaii completed an environmental review, but the company decided to abandon the vessel ending all possibilities of returning to Hawaii.[7]
In January 2010, the United States Maritime Administration announced that Huakai and Alakai would be used to assist with relief in the 2010 Haiti earthquake.[8][9][10]
On March 24, 2016, Bay Ferries Limited announced that it had reached an agreement with the U.S. Maritime Administration and the U.S. Navy for a multi-year charter of HST-2. The vessel would be operated for a passenger/vehicle ferry service in the Gulf of Maine between Portland, Maine and Yarmouth, Nova Scotia and retain the name HST-2, but the service and vessel would be branded as The CAT to align with previous branding used when Bay Ferries operated a high-speed passenger/vehicle ferry on the same route six years prior.[19] The vessel underwent a refit at the Detyens Shipyard in South Carolina and the service started on June 15, 2016.[19][20][21]
At the end of the 2018 season, it was announced that the ferry would be departing from the town of Bar Harbor, rather than Portland.[22][23] Service along this new route was originally expected to begin in summer 2019, but was delayed due to construction work at the Bar Harbor marina.[23] Service was then canceled during both the 2020 and 2021 seasons due to the COVID-19 pandemic.[24] After three years out of port, The CAT returned to sail from Yarmouth on May 19, 2022,[25] providing service to Bar Harbor, Maine for the first time in 13 years.[26]