This page needs additional or more specific categories. Please help out by adding categories to it so that it can be listed with similar articles. (October 2023)
Burnham Greenway
Length5.3 miles (8.5 km)[1]
LocationChicago, Illinois, U.S.
Established1963 (61 years ago) (1963)
UseCycling, skateboarding, scootering, personal transporter, and pedestrians
DifficultyEasy
SeasonLimited access during winter
Trail map
Map

The Burnham Greenway is a 5.3-mile-long (8.5 km) rail trail and partial shared-use path for walking, jogging, skateboarding, and cycling, located along the southside of Chicago, Illinois.[1] There is a project underway to connect the disparate sections of the trail.[2][3]The project has an estimated completion date of 2027.[4]

See also

[edit]

References

[edit]
  1. ^ "Cook County Department of Transportation and Highways Burnham Multimodal Connector Preliminary Engineering and Environmental (Phase I) Study". Village of Burnham. Retrieved 2024-01-21.
  2. ^ Evans, Maxwell (2023-07-06). "The South Side Needs Better Bike Infrastructure. These Big Projects Aim To Close 'Notable Gaps'". Block Club Chicago. Retrieved 2024-05-01.
  3. ^ "County, CDOT hosted bike ride to look at the strengths and weaknesses of SE Side bike infrastructure - Streetsblog Chicago". chi.streetsblog.org. 2023-08-23. Retrieved 2024-05-01.
[edit]