Central Silk Board is an upcoming important elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line[1] of Namma Metro in Bangalore, India. This metro station serves the Central Silk Board area.
As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations [2][3][4][5][6] (under Blue Line, around 2026).
Station Layout (TBC)
Central Silk Board track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Bommasandra next station is Bommanahalli | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road next station is BTM Layout | |
Side platform | Doors will open on the left | ||
L2 |
Blue Line - Station Layout - To Be Confirmed
Central Silk Board track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform # Southbound |
Towards → Train Terminates Here | |
Platform # Northbound |
Towards ← Krishnarajapura / KIAL Terminals next station is HSR Layout | |
Side platform | Doors will open on the left | ||
L2 |