This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. Please help improve this article by introducing more precise citations. (October 2017) (Learn how and when to remove this message)
Hamburg-Altona link line
Overview
Native nameHamburg-Altonaer Verbindungsbahn
Line number
  • 6100 (long-distance)
  • 1240, 1241 (S-Bahn)
LocaleHamburg, Germany
Service
Route number
  • 137.1 (long-distance)
  • 101.11, 101.21, 101.31 (S-Bahn)
Technical
Electrification
Route map

km
km
Hamburg-Altona Kai
Altona station (original)
293.157
5.898
Hamburg-Altona
6.083
former Altona Harbour Tunnel
6.249
0.889
0.982
292.866
291.400
291.075
291.503
Hamburg Rainweg junction
290.91
290.926
Hamburg Holstenstrasse
halt & junction
290.597
Stresemannstraße (Bundesstraße 4 number.svg B 4)
Hamburg Schulterblatt
cattle market branch
289.900
Hamburg Sternschanze
Hamburg Sternschanze
(1903–1912)
289.090
Hamburg Sternschanze
crossover
288.114
288.153
Hamburg Dammtor
287.495
287.528
33 m adjustment
Lombard Bridge
over the Alster
City S-Bahn to Altona
286.663
0.180
Hamburg Hauptbahnhof
(Keilbahnhof)
Klosterthor
former link line
Berliner Bahnhof
former link line
Lower timber bridge
(original route)
Hannöverscher Bahnhof
Upper harbour bridge
(current route)
Hbf marshalling yard
(formerly Lippeltstrasse)
Middle channel
Lübecker Bahnhof
Hamburg Ericus sidings
Wanne-Eickel–Hamburg railway
to Hamburg-Harburg
Harburg S-BahnHammerbrook
Upper harbour channel/Bille
original Berlin route
1.485
Berliner Tor
present Berlin line
Rothenburgsort
Hamburg Rothenburgsort
Ro junction
Freight line to
to Hamburg-Billwerder
S-Bahn to Bergedorf
2.894
Landwehr
4.057
Hamburg Hasselbrook
Horn junction
Lübeck–Hamburg railway to Lübeck
S-Bahn to Ahrensburg (planned)
4.788
Wandsbeker Chaussee
5.448
Eilbek
5.711
Friedrichsberg
Osterbek Canal
7.212
Hamburg-Barmbek
7.280
7.273
7 m adjustment
7.740
8.060
Hamburg-Barmbek
freight yard
8.690
Alte Wöhr
(formerly Stadtpark)
9.551
Rübenkamp
11.201
Hamburg-Ohlsdorf
11.573
Alster Valley Railway
to Poppenbüttel
Langenhorn Railway
to Ochsenzoll
km
Source: German railway atlas[1]

The Hamburg-Altona link line (German: Hamburg-Altonaer Verbindungsbahn) is a railway line in Hamburg, Germany. Nowadays, it connects the lines from the north and northwest of Hamburg and Altona station with Hamburg Hauptbahnhof and the lines to the southwest, south and east. Initially designed as a freight line only, it is now one of the busiest lines in Germany. It includes the suburban tracks of the Hamburg Stadtbahn, originally the core of the Hamburg S-Bahn.

History

[edit]
Old Hamburg stations, new Hauptbahnhof and links

The first railway connection

[edit]

In 1842 the Hamburg-Bergedorf Railway Company opened a 16.5 km line from Hamburg to Bergedorf. In 1846 this line was extended to Berlin. Two years later, the Altona-Kiel Railway Company opened a line to Kiel. There was originally no link between Altona and Hamburg, so freight moving from one line to the other had to be reloaded several times, which was time-consuming and expensive. A two-track link line was therefore built between the stations.

The route of the line is affected strongly in the Hamburg area by the city's former walls. A pile bridge was originally constructed for crossing the Alster river, which was replaced in 1868 by a new bridge, the Lombardsbrücke. The railway was opened in two sections:

South of Klosterthor Station, there were provisional communication rail tracks in the streets to Berlin Station and from 1872 to Venlo Station.

30 years later, the line had already reached its limit and extra capacity had to be added.

Adding capacity and extension of the line

[edit]

On 30 December 1898, Prussia, the city of Hamburg and the Lübeck-Büchen Railway Company agreed to the following elements of the link line:

The widening of the Lombardsbrücke was completed in 1901 and 1902, including the addition of the suburban line. Even as this construction work was underway a new agreement was signed on 12 December 1904 known as the Ohlsdorfer Vertrag (Ohlsdorf contract) providing for:

Old S-Bahn train set for overhead electrification on the 6.3 kV 25 Hz AC system

Electrification was decided on by the Prussian State Railways as track operator, after it had already carried out extensive tests on the Schöneweide–Spindlersfeld line in Berlin, using overhead lines with 6.3 kV 25 Hz AC, the system which it selected for Hamburg.

In late 1906 work was completed. The urban and suburban line to Ohlsdorf was put into operation on 5 December 1906; one day later the new Hamburg Hauptbahnhof was commissioned. About a year later operations with electric trains started on the Stadtbahn and all suburban railways, making the Hamburg network the first electrified suburban rail network in Germany.

Conversion to DC and expansion of the S-Bahn

[edit]

AC operations continued until the late 1930s with few service problems. However, in the meantime electric operations had been established on the Berlin S-Bahn using direct current. Since the technology in use in Hamburg had to be replaced anyway it was decided to switch to using third rail DC current. Even before this decision was made the Stadtbahn and suburban railways were designated as the S-Bahn in 1934, four years after the Berlin network was so named.

Unlike the 800 volt power used in Berlin, the voltage chosen in Hamburg was 1200 volts, which was technically, the maximum voltage that could be used in rail operations. Similarly, it was decided to use bottom contact third rail, which had a clear advantage at points, as the third-rail power would not have to be interrupted. In 1940 transition to the new system began, but, due to the war, conversion could not be completed until 1955.

From the 1960s, there was continuous expansion of the suburban rail network. Although the link line as the core of the S-Bahn had good passenger traffic, it only touches the city centre at its northern edge. Thus, a new central underground line (subsequently known as the City S-Bahn) was planned through the central area, which had more than 300,000 jobs. This required some alterations for the old main line, to allow the connection of the new underground line to the main line at the Hauptbahnhof and its reconnection to Altona station from the south. The entire Altona station building was demolished and subsequently rebuilt in a plain 1970s style. The reason for the new station building was the danger that the old station building would collapse during the construction of the tunnel. The underground S-Bahn station was built with four tracks, which allows trains to be reversed.

Since the construction of the City-S-Bahn, S-Bahn services between the Hauptbahnhof and Altona is split: lines S1, S2 and S3 now run through the tunnel and lines S11, S21 and S31 run on the old main line.

Stations

[edit]
Klosterthor station with the Berliner station in the background

Klosterthor station is at the end the actual link line. From 1902 to 1906, the Stadtbahn was extended parallel with the Lübeck–Hamburg line to Hasselbrook where it turns toward Ohlsdorf.

On 11 December 2008, the underground S-Bahn line opened from Ohlsdorf to Hamburg Airport.

Operations

[edit]

S-Bahn lines S11 (Blankenese–Ohlsdorf), S21 (Elbgaustraße–Aumühle) and S31 (Altona–Neugraben) run on the two northern tracks of the link line (the Stadtbahn). The two southern tracks are used by long-distance and regional trains. Many trains to or from the south serve not only the Hauptbahnhof, but also Altona station. The original purpose of the link line, the handling of freight traffic, is now served by the Hamburg freight bypass, running through the northern suburbs.

References

[edit]

Footnotes

[edit]
  1. ^ Eisenbahnatlas Deutschland [German railway atlas] (in German). Schweers + Wall. 2009. p. 119. ISBN 978-3-89494-139-0.

Sources

[edit]